[ report an error in this record ]basket (0): add | show Print this page

Low-head pumped hydro energy storage: Maximising the round-trip efficiency to increase competitiveness for providing grid services
Prasasti, E.B.; Joseph, M.; Truijen, D.P.K.; Zangeneh, M.; De Kooning, J.D.M.; Stockman, K.; Terheiden, K. (2025). Low-head pumped hydro energy storage: Maximising the round-trip efficiency to increase competitiveness for providing grid services. Journal of Energy Storage 135: 118192. https://dx.doi.org/10.1016/j.est.2025.118192
In: Journal of Energy Storage. Elsevier: Amsterdam. ISSN 2352-152X; e-ISSN 2352-1538, more
Peer reviewed article  

Available in  Authors 

Author keywords
    Low-head pumped hydro energy storage;Contra-rotating;Variable speed;Reversible pump-turbine;Power take-off;Bulb design;Round-trip efficiency;Operation scenario;wind power;daily operation;system;optimization;generation;design;feasibility;plant;solar

Authors  Top 
  • Prasasti, E.B.
  • Joseph, M.
  • Truijen, D.P.K., more
  • Zangeneh, M.
  • De Kooning, J.D.M., more
  • Stockman, K., more
  • Terheiden, K.

Abstract
    According to the European-Green-Deal, the demand for deployment of storage technologies is predetermined to increase the share of renewable energy sources e.g. solar/wind in electricity generation. Pumped hydro energy storage (PHES) systems represent a well-developed storage technology. Traditionally, PHES systems are established in mountainous regions, but lowland countries with huge offshore wind parks lack such regions. Therefore, new developments in low-head turbomachinery, power take-off (PTO) units and operation schemes are needed to shape low-head PHES towards a viable future technology (performance/investment). Hence, a novel contra-rotating, variable-speed, reversible pump-turbine and PTO design for low-head operation is developed with an optimised round-trip efficiency (RTE) to guarantee competitiveness to other energy storage system (ESS) technologies. The investigations demonstrate that high RTE over 72 %, comparable to those of high-head PHES systems, can be reached. Operation scenarios "best efficiency" show a higher RTE than "10 MW constant power output'' due to wider operation ranges (fallhead/discharge) at high efficiencies. Additionally, larger dam sizes lead to a higher RTE due to higher operation flexibilities but with higher investment costs. Furthermore, the novel offshore low-head pumped hydro energy storage (LH-PHES) design benefits, besides its highly efficient operation, from being insensitive to climate change impacts, floods/droughts, extreme temperature changes compared to e.g. alpine PHES or batteries.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors