IMIS | Lifewatch regional portal

You are here

IMIS

[ report an error in this record ]basket (0): add | show Print this page

Feasibility study of Asan bay integrated development and lock gate construction project
Wens, F.; Thues, G. (1995). Feasibility study of Asan bay integrated development and lock gate construction project. Se-Kwang Korea Engineering Consultants: [s.l.]. 34 + appendices pp.

Available in  Authors 
Document type: Project report

Keywords
    Access
    Anchorages > Harbours
    Construction
    Structures > Hydraulic structures > Coastal structures > Port installations
    INW, Korea, Rep., Asan Bay
    Marine/Coastal

Authors  Top 

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors